Production

Produkcja

Prefabricated concrete bathroom:
Concrete block with solid durability, resistant to deformation, floor made of C 30/37 concrete, 2600 kg / m3, walls and ceiling made of LC 20/22. All elements made on various steel forms with necessary installations sunk, production tolerances for semi-finished products ± 3 mm. All used materials have access to quality certificates of leading manufacturers. We implement a variety of projects from modest minimalist to comfortable with a high standard.

 

Prefabricated steel construction bathrooms:
The latest technology, highly repeatable production, all profiles and panels produced by a CNC machine with accurate dimensions and automatically prepared flights. Steel structure of the bathroom placed on a concrete floor, wall and ceiling profiles made of 9 mm thick galvanized steel, connected with screws. The design of the bathroom is made of C-profile 75 mm with all the necessary holes for electricity, plumbing and drainage. The internal surface of the bathroom is clad with 15 mm Fermacell, which gives the weight of the wall and ceiling only 20 kg / 1 m2 plus tiles.

Quality

The quality of our products is the distinguishing factor of Ready Bathroom and is the foundation of our projects. The implemented internal control system together with the acceptance protocol is carried out individually for each bathroom, and all production notes are meticulously recorded and forwarded to subsequent departments along with changes in the position of the production process. In case of problems, the cross-check system automatically informs you of the need for corrective action.

The audit was divided into two stages - Initial technical acceptance and final opinion of a technical expert.

1. Initial technical acceptance shall include:

  • measurement of specific forms and verification of their compliance with project documentation
  • verification of the dimensions and geometry of the bathroom cabin
  • checking the correct application of sealing tape and moisture insulation
  • control of tiling works, etc.

2. The final opinion of the technical expert shall include:

  • verification of water and sewage installation tightness
  • electrical installation efficiency and completeness
  • dimensions, location and compliance of sanitary fittings
  • visual and aesthetic appearance of the final product: painting works, applying silicone, etc.
  • logo
  • logo